Two divisions · one team

Equal weight, end to end.

Two divisions, one team: sand logistics and water services, run by one coordinator with one set of paperwork and one safety culture.

Loaded frac-sand railcars and pneumatic trucks at a transload yard

Frac Sand Logistics

Railcar oversight, transloading, trucking, and inventory, coordinated end to end.

Railcar MgmtTransloadingTrucking
Water tanker truck beside an industrial reverse-osmosis plant

Bulk Water & RO/DI Supply

Bulk water delivery, RO/DI water from our new Pecos plant, and engineered water treatment systems.

Bulk DeliveryRO/DI WaterTreatment Systems
Why SanBar

One operator. Two materials. No hand-offs.

Single coordinator

One team across rail, transload, and trucking, and across sand and water on the same pad.

Shared visibility

Status, ETAs, and digital paperwork in one view, from load to offload.

Lower delivered cost

Routing, turn-time, and full payloads to cut cost per ton and per barrel.

Safety first

Safety built into daily work across both divisions.

Sand and water together

One company for sand and water on the same pad.

Operators running a pad need frac sand and water, usually from two vendors, on two schedules, with two sets of paperwork. SanBar runs both from one basin-local team in Pecos. One coordinator sequences rail-to-truck sand and bulk or RO water against the same job calendar, with shared tracking, and one team accountable for the whole job.

See how we run both

Featured projects

Real programs. Real lanes.

Sand and water programs we run across the Permian and Delaware basins.

View all projects

By the numbers

Measured, not claimed.

Figures below are placeholders pending verified SES data.

[XX]+Years in Operations
[XX]M+Tons Coordinated / Year
[XX]MGal/Yr RO Capacity
[XX]Basins Served
Coverage

Based in Pecos, Texas. Built for the Permian and Delaware basins.

We run in-basin, where short hauls keep delivered cost and response time down. We're set up for the Texas basins, and we'll plan capacity for other regions on request.

Talk to a coordinator

PECOSPERMIAN /DELAWARE
Credentials

Prequalified for procurement.

Placeholder credentials, SES to confirm which it holds before publishing.

TCEQ-Licensed
Placeholder
ISN Registered
Placeholder
Avetta Member
Placeholder
Veriforce Participating
Placeholder
DOT-Compliant Fleet
Placeholder
TWQA Member
Placeholder

Get a lane plan or a water plan. Same form, same team.

Or call 682-400-8157

Call NowRequest Quote